Keep HSE worktraceable fromfirst signal tofollow-up.

Capture, assign, follow through and see what requires attention — across your sites.

Operational signal → reviewed route → controlled HSE work

HSE professional documenting damaged industrial equipment with a tablet.
CaptureHSEVIA Capture
Damaged machine guardbeside blocked emergency access route.
Suggested registerInspection / observation
Continue

Finding the issueis only the start.

The hard part is keeping the signal, owner, follow-up and evidence connected until the work is actually handled.

01

Signal

A condition, observation or requirement enters the workflow.

HSE professional inspecting industrial equipment in the field.
02

Follow-up

Ownership, action and evidence now have to stay connected.

Supervisor and worker coordinating follow-up work.
03

Visibility

Management needs a clear view of what changed and what remains open.

Operations leaders reviewing HSE work together.

HSEVIA keeps the work after the first signal connected.

Illustrative product example — not live customer data

Capture once.Continue with context.

Describe what happened by text, voice or photo. HSEVIA suggests the right register so the work can continue without losing the original signal.

HSE professional documenting a leaking industrial flange with a tablet.
1

Capture

Describe what you found

Text Speak Attach
Leaking from flange on north side of pump area.42/1000
Approved illustrative photograph of the leaking flange.
Add morephotos or files
Block A - Process Area
HSEVIA suggests
Inspection / Observation
Continue to register
2

Inspection / Observation

The captured signal becomes a controlled HSE record

Created from capture
InspectionsINS-2024-0187
Edit

Leaking from flange on north side of pump area.

StatusIn Progress
PriorityHigh
OwnerAli Raza
Due date12 Mar 2024
DetailsEvidenceActivityRelated
Approved illustrative flange evidence photograph.
Site
Block A - Process Area
Category
Equipment / Mechanical
Description
Leaking from flange on north side of pump area. Observed during routine walk-through.
Reported by
Usman Khan 10 Mar 2024, 10:24
01

Capture what you found

What did you find?
Text Speak Attach
Approved illustrative photograph of the damaged machine guard.
Damaged machine guard on pump area.32/500
SiteNorth Process Plant
LocationPump Area / P-101
02

HSEVIA suggests

Suggested registerInspection / Observation

You review and continue.

03

Continue to register

Damaged machine guardInspection / Observation
Open
SiteNorth Process Plant
CategoryEquipment
RiskMedium
OwnerHSE Team
Evidence1 photo attached
Reported byArjun Mehta12 Nov 2024, 16:20

Illustrative product example — not live customer data

See where attention is needed.

View sites in context and surface the work that needs management attention — without losing the records behind it.

Operations MapSites plotted from recorded coordinates
CriticalWatchOn track
34.5°33.5°32.5°31.5°30.5°29.5°
69.0°70.0°71.0°72.0°73.0°74.0°75.0°76.0°
North Process PlantLahore, Pakistan31.42, 72.18
Ravi Textile UnitLahore, Pakistan31.93, 71.48
Packaging UnitFaisalabad, Pakistan30.21, 69.98
North WarehouseIslamabad, Pakistan33.72, 72.35
Central WorkshopMultan, Pakistan29.87, 72.90
East FacilityKarachi, Pakistan30.66, 74.12
North Process PlantLahore, Pakistan
Critical
3Overdue
2High risk
11Open
38Records
Not located (1)Sites without coordinates are listed here and are not shown on the map.
Remote SiteCoordinates not recorded
North Process PlantLahore, Pakistan
Critical
3Overdue
2High risk
11Open
38Records
Not located (1)Remote Site · Coordinates not recorded

Illustrative product example — not live customer data

Built around real HSE operations.

Move from inspections and permits to actions, audits and environmental work without breaking the trace between records.

InspectionsRisk / JSAPermit to WorkActionsMore ↓
Permit to Work PTW-2024-0317Hot work on process line with temporary isolation
Active Edit
Permit type Hot Work
Permit reference PTW-2024-0317
SiteNorth Process PlantLahore, Pakistan
Start date 12 Mar 2024
Expiry date 15 Mar 2024
Status Active
Work description

Welding work on pipe support bracket. Temporary isolation in place. Work to be completed during planned shutdown window.

Work location / Equipment

Process Line 3North Process Plant

Hazards and controls
⚠ Fire riskHot surfacesFumesIsolationLock / tagGas testingFall protectionUtility clearanceFire watch
View hazards and control measures →
Requested by

Ali RazaHSE Officer

Contractor

ABC Maintenance Ltd

Responsible person

Ahmed KhanMaintenance Supervisor

Attachments / Evidence
Industrial flange supporting permit evidenceIsolation Plan.pdfPDF · 1.2 MBAdd photos
or files
OverviewApprovalsActivityRelated recordsDetails
▣Draft
●Pending approvalRequires authorized review
ActiveWork can proceed
●ClosedAfter work completion
Permit to WorkPTW-2024-0178Hot Work Permit
Active
SiteNorth Process PlantLahore, Pakistan
Start date12 Nov 2024 · 08:00
Expiry date12 Nov 2024 · 18:00
Work descriptionHot work on pipeline flange (welding).
Work locationUtilities Area · Line 3 – Flange F-201
Requested byArjun Mehta
Responsible personImran Khan
ContractorSafeFix Ltd.
Key hazards and controlsView hazards and control measures →
Fire riskHot surfacesFumesIsolationFire watch
Evidence and documents Add photos or files
Illustrative permit evidence showing isolated industrial equipment.
Illustrative field context for the permit work.
PTW Checklist.pdf245 KB
Permit lifecycle
DraftPending approvalActiveClosed

A controlled permit process

Manage permit requests, controls, evidence, human approval and close-out with the key information kept together.

  • Right people and responsibilities clear
  • Hazards and controls documented
  • Validity and conditions defined
  • Supporting evidence retained
  • Controlled lifecycle through close-out

Connected HSE work

Manage permit work alongside inspections, risk assessments, corrective actions and evidence so operational context is easier to follow.

HSE professional reviewing controlled work in an industrial process area.

Part of a wider HSE workspace

Permit to Work sits within the same operational workspace as inspections, risk, actions, audits and environmental work.

Illustrative product example — not live customer data

AI can assist. Accountability stays human.

HSEVIA can help structure signals, surface context and prepare work — while approvals, verification and high-impact HSE decisions remain with accountable people.

HSEVIA suggestionBased on the completed action and attached evidence.
Evidence added — action may be ready for verification.

The attached photos and notes indicate the damaged machine guard has been replaced and the area is now secured.

Suggested next step
Send for verificationThis action appears complete. Request review by an authorized person to verify and close.
Additional context
Originating recordInspection / Observation
Related documents2 files
Corrective ActionCA-2024-0187
● Pending verification

Damaged machine guard replaced

North Process Plant · Lahore, Pakistan

Priority●  High
Due date10 Mar 2024
OwnerAli RazaMaintenance Technician
Status● Completion requested
Description

Replace the damaged machine guard and secure access to the area.

Evidence (3)
Illustrative evidence views of the replaced machine guard.
Add photos
or files
Human reviewAn authorized person reviews the evidence and confirms closure.Assigned reviewer: Arjun Mehta · Authorized reviewer
Review notes (optional)

Evidence reviewed. Machine guard replaced and area secured. Work completed as per requirement.

Supporting evidence showing the replaced machine guard.
Verify & closeReturn for follow-up

Human-controlled decisions

High-impact actions require explicit human review.

Clear ownership

Every meaningful piece of work has an accountable person or role.

Traceable evidence

The decision can be understood from the record and supporting evidence.

Built for the work between finding a problem and proving it was handled.

HSEVIA keeps signals, ownership, evidence and follow-up connected so operational work remains visible and accountable.

HSE professional reviewing work in an industrial environment at sunset.HSE professional standing in an industrial environment.

Human-controlled decisions

High-impact HSE decisions remain explicit human actions.

Site-scoped access

People work within the Sites and responsibilities they are authorized to access.

Traceable records & evidence

Operational context, ownership and supporting evidence stay connected to the work.

Learn more about HSEVIA →
Approved montage of HSE professionals inspecting equipment, coordinating work and reviewing evidence.Approved mobile composition showing HSE field inspection work.